Demolition of former Water Treatment Works
Wrexham, UK
Demolition of former Water Treatment Works carried out beside a live 19 million litre capacity reservoir that was perceived as a structural failure risk and had to be protected at all times.
Key Issues:
Protection of live 19 million litre capacity reservoir